介绍了某高层建筑由于施工管理安排不当,致使裙楼顶部与主楼悬挑部分发生碰撞接触的工程事故,经过对事故原因分析论证及方案比选,提出了切实可行的简便处理方案,实际观察表明,该方案达到了预期效果。
The author introduces the engineering accident that the impact contact occurs in the top of the skirt building and the cantilever part of the main building caused by the mismanagement of the construction of the high-rise building, puts forward the feasible simple treatment scheme through the analysis of the accident cause and the scheme comparison, the practice proves that the scheme achieves the expected effect.
出处
《山西建筑》
2008年第34期107-108,共2页
Shanxi Architecture
关键词
软土
桩基
施工顺序
不均匀沉降
事故处理