摘要
应用露天矿剥离工艺优化选择模型,优化准格尔矿区二期即将开发的哈尔乌素露天矿表土和岩石剥离工艺。通过研究认为哈尔乌素露天矿中部60m左右的岩石剥离最佳开采工艺是采用单斗一汽车-破碎机-胶带-排土机半连续系统,表土及上下部岩石的剥离宜采用单斗-汽车间断工艺系统。
Using the model of the optimization of the mining technology of open pits, the stripping technology of surface soil and rock in Haerwusu Coal Mine of Zhungeer Mining Area is studied.The proper mining technology of surface soil and upper rock benches is excavator - truck technology, the proper stripping technology of middle stable rock benches is excavator - truck - crusher - conveyor - dumping machine technology, and the strpping technology of the 1ower rock benches is also excavator - truck technolngy.
关键词
露天矿
开采工艺
剥离
最佳化
Open pit, Mining technology, stripping, Optimization