期刊文献+

桥梁线形控制中徐变变形的一种计算方法 被引量:2

One Calculation Method of Creep Deformation in Bridge Linear Controlling
在线阅读 下载PDF
导出
摘要 对于大跨径混凝土连续刚构桥的施工监控,线形的控制主要集中在预拱度的设置上,而预设拱度又与桥梁结构的变形计算紧密相连。其中,混凝土徐变变形是很难计算准确的,因而从理论上建立了一个计算这种徐变变形的理论计算公式,其计算结果与其它方法的计算结果基本一致,优点是计算简单准确。 Monitoring the long-span continuous rigid bridge construction,linear controlling mainly concentrates on the pre- camber settings. And pre-arch is closely linked with the cach of bridge structure deformation. The concrete creep deformation is difficult to calculate accurately, therefore, a theoretical formula is established theoretically to calculate this kind of creep deformation. Its calculating results are basically consistent with those got by other methods, but its simple calculation and high precision are advantageous.
出处 《重庆交通大学学报(自然科学版)》 CAS 2008年第5期675-678,共4页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 混凝土徐变 线形控制 预拱度 施工控制 concrete creep linear control pre-arch the controlling of construction
  • 相关文献

参考文献2

  • 1范立础.预应力混凝土连续梁桥[M].北京:人民交通出版社,1999..
  • 2[6]葛耀君.节段施工桥梁分析控制[M].北京:人民交通出版社,2003.

共引文献12

同被引文献9

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部