摘要
武广客运专线XXTJI标制枕场,在总体布置和方案上采用了新的施工理念,按照精细化、工厂化的思路规划和设计制枕场,以保证预制产品质量和工期。对本制枕场预制双块式轨枕的关键技术问题进行总结,提出客运专线制枕场建设需要进一步研究的课题,供今后铁路客运专线制枕场建设参考。
Lot XXTJI Sleeper Factory in Wu-Guang PDL has adopted a new construction concept on the general layout and plan, which is based on idea of intensive management and industrialization, to guarantee the quality and construction period of prefabricated products. This article summarizes the key technical problems of double-block sleeper prefabrication in this factory, and presents the topics requiring further study, which can be used for reference in the future PDL sleeper factory construction.
出处
《铁道建筑技术》
2008年第5期14-16,30,共4页
Railway Construction Technology
关键词
铁路客运专线
制枕场
配套设备
Railway Passenger Dedicated Line (PDL)
sleeper factory
supplemental equipment