摘要 在对滑坡工程中全埋式抗滑桩间土拱效应分析的基础上,提出了以桩间静力平衡条件、跨中截面强度条件以及拱脚处截面强度条件共同控制来确定桩间距,得到了较为合理的桩间距的计算公式,定量地说明了在其他因素不变的情况下,桩间距随桩后土体粘聚力或内摩擦角的增大而增大,却随着桩后坡体推力的增大而减小。最后,以工程实例说明了桩间距的计算过程并得到了比较合理的计算结果。 Anti-sliding pile has been used for prevention and cure landshde more than 40 year, but the radical theory to decide the max distance of one another pile hasn't been set up to now, and the suitable distance of one another depend mostly on expert's experience to decide in work. The paper start from the principle and the mechanical characteristic of forming soil arch of square pile, and analysis roundly the power and the deformation and of soil arch between two anti - sliding pile, and the instant most distance between two piles when soil arch is been destroyed as well as, also set up the plane model to decide the suitable distance between two piles.
作者 王玉平
出处 《四川建筑科学研究》 北大核心 2008年第5期120-123,共4页 Sichuan Building Science
关键词 全埋式抗滑桩 土拱 最大桩间距 embedded anti-sliding pile soil arch between one another pile suitable space distance between two piles
  • 相关文献

参考文献6

二级参考文献15

  • 1金培杰,王翔.川藏公路前龙段龙胆溪1~#、2~#滑坡的形成机制分析与工程治理措施[J].中国地质灾害与防治学报,2000,11(3):88-92. 被引量:5
  • 2吴子树,张利民,胡定.土拱的形成机理及存在条件的探讨[J].成都科技大学学报,1995(2):15-19. 被引量:98
  • 3铁道部科学研究院西北研究所.滑坡防治[M].北京:人民铁道出版社,1981..
  • 4铁道部第一勘测设计院.铁路工程设计技术手册--路基[M].北京:中国铁道出版社,1995.8-12.
  • 5徐志英,岩石力学,1984年
  • 6林峰,山地学报,2000年,18卷,增刊,69页
  • 7金培杰,中国地质灾害与防治学报,2000年,11卷,3期,88页
  • 8张倬元,工程地质分析原理(第2版),1994年
  • 9国家防汛抗旱总指挥部办公室,山洪泥石流滑坡灾害及防治,1994年
  • 10铁道部科学研究院西北所,滑坡防治,1981年

共引文献353

同被引文献13

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部