南京九华山隧道主体结构变形分布式光纤监测技术应用 被引量:3

Nanjing Jiuhuashan Tunnel Use FBG Technology for Supervision Tunnel Main Structure Deformation
原文传递
导出
摘要 运用分布式光纤传感技术FBG,建立了南京九华山隧道主体结构变形的离线长期监测系统,介绍了FBG测量原理。在隧道运营阶段中,对结构混凝土应变与伸缩缝位移进行了长期的监测,并对结果进行了分析。监测结果表明,隧道山体段与湖底段变形均处于安全阈值内,且隧道变形主要受到环境、季节温差、降水等因素影响。 FBG is applied to establish the long-term supervision system monitoring the deformation of main structure of Nanjing Jiuhuashan Tunnel.During the operation stage,the system monitors the concrete strain and displacement of expansion joint and makes analysis to the results.The monitoring results show that the deformation of tunnel(both the mountain section and the lake section),which is influenced by environment,seasonal temperature difference and precipitation,is within the safe threshold value.
出处 《地下工程与隧道》 2008年第3期45-48,共4页 Underground Engineering and Tunnels
  • 相关文献

参考文献4

二级参考文献12

  • 1蒲武川,廖红建,邵珠山.地下隧洞对地面沉降影响的数值分析[J].地质与勘探,2003,39(z2):145-149. 被引量:5
  • 2佘健,何川.连拱隧道施工全过程有限元模拟[J].现代隧道技术,2004,41(6):5-11. 被引量:19
  • 3李进军,王显春,庄纪栋,黄茂松.浅埋暗挖隧道穿越楼房基础的三维数值模拟[J].地下空间与工程学报,2005,1(1):78-82. 被引量:23
  • 4金丰年,钱七虎.隧洞开挖的三维有限元计算[J].岩石力学与工程学报,1996,15(3):193-200. 被引量:84
  • 5[1]中国建筑科学研究院.GB50204-2002 混凝土结构工程施工质量验收规范[S]
  • 6[2]中国建筑科学研究院.GB50010-2002 混凝土结构设计规范[S]
  • 7李德才.广州地铁二号线公纪区间渡线大跨隧道施工过程的三维有限元分析.世界隧道,2000,:401-401.
  • 8MROUEH H,SHAHROUR I.A full 3-D finite element analysis of tunneling-adjacent structures interaction[J].Computer and Geotechnics,2003(30):245-253.
  • 9KOOI C B,VERRUIJT A.Interraction of circular holes in an infinite elastic medium[J].Tunnelling and Underground Space Technology,2001(16):59-62.
  • 10铁道第二勘察设计院.南京市城东干道九华山隧道工程施工图设计.九华山隧道暗挖段土建工程第三册[R].