介绍通过改造螺滩水电站进水口拦污栅的布置型式,将斜面拦污栅改为折线型拦污栅,使过栅水头损失明显减小,充分利用了水力资源,提高了经济效益.
Through modificating the screen layout of the entry of Luotan hydropower station, from inlined screen to mansard screen, the water head loss is remarkably reduced and water resources is made good use of. The economic benefit is improved.
出处
《江西水利科技》
2008年第3期204-205,共2页
Jiangxi Hydraulic Science & Technology
关键词
电站
进水口
折线型拦污栅
应用
Power station
Entry
Mansard screen
Application