2TARIQ A,ALI A.New Heuristics for M-machine No-wait Flowshop to Minimize Total Completion time[J].Omega,2004,32:345-352.
3JOZEF G,JAROSLAW P.Some Local Search Algorithms for No-wait Flow-shop Problem with Makespan Criteria[J].Computer & Operations Research,2005,32:2179-2212.
4EDY B.Heuristic Algorithm for Scheduling in the No-wait Flow-shop[J].Journal of Materials Processing Technology.2000,107:459-465.
5WOOHS,YIMDS.A Heuristic Algorithm for Mean Flowtime Objective in Flowshop Scheduling[J].ComputersOpsRes.1998,25:175-182.
6RAJENDRAN C,ZIEGLER H.An Efficient Heuristic for Scheduling in a Flowshop to Minimize Total Weighted Flowtime of Jobs[J].European Journal of Operational Research,1997,103:129-138.