期刊文献+

永定新河挡潮闸运行方式研究 被引量:1

Study of the Gate Operation Mode of New Yongding River
在线阅读 下载PDF
导出
摘要 根据感潮河道水沙运动特点,建立了适用于有闸河道的一维泥沙、水质数学模型,可以对闸门不同运行方式下水流、泥沙、污染物运动进行模拟。并运用该模型,对永定新河蓄淡、蓄咸两种闸门利用方式下泥沙、污染物运动进行了研究,为闸门运行方式的选择提供了依据。 According to water and sediment movement characteristics of the tidal river, an one-dimensional sediment and water quality model have been established, which can be used on the river controlled by a gate and to simulate the movement of water sediment and pollutant during different operation modes of gate. In new Yongding River, this model have been used to study the transportation of sediment and pollutant when using two operation modes which are the mode of storing fresh water and the mode of storing sea water, and a right operation mode of the gate may be get according to the study.
作者 赵瑾琼
出处 《科学技术与工程》 2008年第18期5331-5335,共5页 Science Technology and Engineering
关键词 挡潮闸 泥沙 水质 downstream reach of tidal sluices sediment water pollution
  • 相关文献

参考文献3

二级参考文献13

  • 1成都科学技术大学水力学教研室.水力学[M].北京:人民教育出版社,1979..
  • 2赵今声.如何扩大和维持海河及永定新河泄洪能力[J].海河水利,1986,(3).
  • 3秦文凯,汊道悬移质分沙的模型,1996年,3期,21页
  • 4Zhu Yiliang,Advances in Hydro-Science and Engineering,1995年,1391页
  • 5Choi G W,Water Resour Res,1993年,29卷,2期,321页
  • 6韩其为,汊道悬移质分沙的模型,1992年,1期,44页
  • 7吴寿红,水利学报,1985年,8期,42页
  • 8张二骏,华东水利学院学报,1982年,1期,1页
  • 9Akan A O,J.Hydr.Div.,ASCE,1981年,107卷,7期,719页
  • 10丁君松,泥沙研究,1981年,1期,58页

共引文献38

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部