摘要
本文通过在杭千高速隧道群监测的实践,对隧道监测项目的选择和测点布置问题进行了详细阐述,提出了在不同监测目的下选择合适的监测项目和合理的测点布置,可以起到事半功倍的效果,以供隧道监测工作者参考。
Based on monitoring works on tunnel of Hang-qian highway, the monitoring item selection and sensor placement optimization are discussed in this paper. Then, a new method is proposed, it should be very instructive and informative for the similar engineering.
出处
《工程勘察》
CSCD
北大核心
2008年第10期59-62,共4页
Geotechnical Investigation & Surveying
关键词
隧道
监测项目
测点布置
tunnel
monitoring item
sensor placement