曹娥江大闸围堰工程水流泥沙冲淤数值模拟计算 被引量:6

Numerical simulation of sediment scour and siltation of the cofferdam of Cao′e River Floodgate
在线阅读 下载PDF
导出
摘要 采用平面二维水流泥沙数学模型计算分析了曹娥江大闸围堰施工期河道冲淤情况.在验证计算的基础上,对围堰工程附近河床冲淤和冲刷防护的预测分析表明,受过流断面缩窄的影响,围堰右侧的曹娥江河道断面将产生冲刷;围堰上下游侧水域靠近曹娥江左岸处的泥沙有所淤积;由围堰引起的泥沙冲淤量和冲淤范围变化不大,仅局限在桑盆殿以下的曹娥江河道.计算成果已为有关单位在设计施工中参考使用,为施工期围堰堤角的冲刷防护提供了科学依据,也为类似工程建设积累了经验. This paper adopts a two-dimensional mathematicd model for river flow and sediment transport to calculate and analyze the river scour and siltation duning construction of the cofferdam of Cao'e River Floodgate. On the basis of verification and calculation, the predictive analyses of the riverbed scour & siltation and scour protection near the cofferdam show that, affected by the narrowing of the cross-section, the river channel section of the Cao'e River on the right side of the cofferdam will suffer from scour; there will be sediment silting in the upstream and downstream waters of the cofferdam and along the left bank of the Cao'e River; changes in sediment scour & siltation quantity and scope caused by the cofferdam will be not great, and will be only found in the Cao'e River channel below Sangpendian. The calculated results have been applied to design and construction. The study has provided scientific evidences for the scour protection of cofferdam banks and corners during construction, and experiences for similar project construction.
出处 《水利水运工程学报》 CSCD 北大核心 2008年第3期52-57,共6页 Hydro-Science and Engineering
关键词 围堰工程 水流冲刷 数值模拟 曹娥江大闸 cofferdam flow scouring numerical simulation Cao'e River Floodgate
  • 相关文献

参考文献10

  • 1Daoyang Ding, Philip L-F Liu. An operator-splitting algorithm for two-dimensional convection dispersion reaction problems [ C ]//Niki H, Kawahara M. Proc of Int Conf on Computational Methods in Flow Analysis. Tokoyo : 1988 : 1101-1108.
  • 2吴时强,丁道扬.剖开算子法解具有自由表面的平面紊流速度场[J].水利水运科学研究,1992(1):39-48. 被引量:23
  • 3林秉南 黄菊卿.钱塘江河口潮流输沙数学模型[J].泥沙研究,1981,(2):17-27.
  • 4Liu Jia-Ju. Determination of Silt Concentration on Shoal under the Action of Wind Wave and Tidil Currents [ C ]. Coastal and Port Eng in Developing Countries, 1987.
  • 5Dai Zeheng, Jiang Wei. Fluvial Processes and Regulation Practice of the Qiantang Estuary [ C ]. Circular No. 5, International Research and Training Center on Erosion and Sedimentation(IRTCES) , Beijing, China, 1996.
  • 6金桂中.曹娥江感潮河段洪水特征及防洪对策[J].浙江水利科技,2002,30(3):53-54. 被引量:5
  • 7吴修锋,吴时强,周杰.曹娥江大闸闸上河道水流泥沙冲刷数值模拟计算[J].水动力学研究与进展(A辑),2008,23(1):96-100. 被引量:8
  • 8童中山,吴修锋,吴时强,等.浙江省曹娥江大闸闸上河道水流泥沙冲刷试验研究报告[R].南京水利科学研究院,2005.
  • 9吴修锋,吴时强,万声淦.浙江省曹娥江大闸闸上河道水流泥沙数值模拟研究报告[R].南京:南京水利科学研究院,2006.
  • 10吴修锋,吴时强,万声淦.浙江省曹娥江大闸围堰工程水流泥沙数值模拟研究报告[R].南京:南京水利科学研究院,2006.

二级参考文献10

共引文献44

同被引文献73

引证文献6

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部