摘要
结合参与四川汶川"5.12"抗震救灾行动,介绍了四层砖混结构危险楼房的控制爆破拆除。文中包括爆破方案的确定、爆破参数、起爆网路和爆破安防护,同时对本次爆破效果进行了描述并提出几点体会。
This paper introduces controlled blasting demolition of a dangerous brick-concrete structure building of four floors in accordance with the action of "5.12" erthquake-resistance in Wenchuan. It includes the determination of the blasting program, the blasting parameters, detonating network, safety blasting protection measures. The paper also describes the blasting results and summarizes some viewpoints.
出处
《煤矿爆破》
2008年第3期35-37,共3页
Coal Mine Blasting
关键词
爆破拆除
爆破参数
爆破震动
directional blasting
blasting parameters
blasting vibration