摘要
本文简述了我国引进技术自行制造的第一台600MW汽轮机组的启动调试情况和两项特殊情况下的调试措施。提出了在调试中值得注意的若干问题,供同类型汽轮机组的启动调试工作参考。
The start-up test of the first domestic-manufactured 600MWturbogenerator set by imported technology in this country is brieflydescribed in this paper. Test measures under two special conditions arealso described and several noteworthy problems during the test arementioned.
出处
《华东电力》
1990年第5期4-8,共5页
East China Electric Power