针对韶钢的现场情况,选择合适的喷洒点向焦炭喷洒ZBS添加剂溶液,并在7号高炉(2200m^3)进行了工业性试验。试验结果表明,试验期间喷洒ZBS溶液的焦炭反应性(CRI)较未喷洒ZBS溶液的降低了8.3%,CSR提高了5.4%;与基准期相比,试验期间7号高炉的产量日增加1.4%,综合焦比降低3.47%。
The fit points were chosen for coke sprayed with ZBS additive, which then used in blast furnace No 7. (2 200 m^3) according to the locale circumstance of Shaoguan Iron and Steel Co Ltd, The results are as follows:The coke reaction index (CRI) of the coke sprayed with ZBS additive solution decreased by 8.3 %, and the coke strength after reaction (CSR) increased by 5.4% in compansion with those of the un-sprayed coke. During the industrial experiment, the average iron output increased by 1.4%er day, the coke rate reduced by 3.47%