期刊文献+

土钉墙分步开挖中挡土机理分析 被引量:1

Earth-Retaining Mechanism Analysis for Soil-Nailing Walls During Step Excavation
在线阅读 下载PDF
导出
摘要 土钉墙和由它派生出的复合支护方式在实际工程中广泛应用,但在理论上对它的挡土机理研究还不够。本文对均质土中的土钉墙,采用数值分析方法,探讨开挖过程中土钉、面层、土体三者的受力变化及土钉墙的稳定机理,得到了面层受到的总土压力是主动土压力的0.05倍等一些结论。 The soil - nailing wall and the composite earth - retaining structures derived from it have widely been used in deep excavation. However,its earth -retaining mechanism has been investigated to be insufficient. With use of numerical analysis, this paper discusses the stability mechanism of soil - nailing wall in homogenous soil by analyzing the stress change during excavating within soil nails, the facing and soil mass, which make up of the structure of soil - nailing wall. Some conclusions are presented, for example, that the pressure force on the facing of soil - nailing wall is about 0.05 times the value of the total active thrust determined by the Rankine's theory.
作者 杨育文
出处 《城市勘测》 2008年第4期138-141,共4页 Urban Geotechnical Investigation & Surveying
关键词 土钉墙 面层 数值分析 主动土压力 soil - nailing wall facing numerical analysis active earth pressure
  • 相关文献

参考文献4

二级参考文献9

共引文献13

同被引文献12

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部