摘要
重点叙述钢质桩基式平台安装就位的控制过程,对安装过程中出现的倾斜、下沉、拒锤等现象进行分析和讨论,提出解决和处理的办法,以便更好地指导生产。
In this paper, how to control the installation of pipe-platforms is described; the problems usually present in the process are systematically analyzed, such as slanting, sinking and refusing hammer. Solving methods are proposed, in order to guid the production better.
出处
《中国海洋平台》
2008年第4期52-56,共5页
China offshore Platform
关键词
钢质桩基
导管架
海上安装
注意事项
pipe-platforms
installation on the sea
attention problems