摘要
分析了排架结构厂房爆破后的受力状况,指出了反向坍塌的原因,并根据力学计算修改施工方案,实践证明是可行的。
The state of exploded frame bent construction building is analyzed.The causes of reverse collapse are pointed out.The design is revised in accordance with mechanics calculation.The demolishing method is proved feasible with an engineering example.
出处
《工程爆破》
1997年第3期50-52,32,共4页
Engineering Blasting
关键词
排架结构
定向坍塌
厂房
爆破折除
Frame bent construction Directional collapse blasting