期刊文献+

鄂尔多斯盆地东北部天桥岩溶地下水区域模型与嵌套模型

Regional model and imbedded model of the Tianqiao karst groundwater system in the northeastern Ordos basin, China
在线阅读 下载PDF
导出
摘要 如何评价陕北能源化工基地黄河西岸非完整岩溶水系统的地下水资源是一个难点。通过建立区域模型(1km×km)和嵌套水源地模型(100m×100m),利用大尺度的区域模型为小尺度的精细水源地模型提供边界水头。通过6种不同的开采方案模拟的结果,分析了黄河西岸水源地开采对周边水源地和区域地下水系统的影响,确定了天桥岩溶系统中各子泉域之间的相互关系和万家寨水库蓄水对地下水循环补给的影响,评价黄河西岸水源地可开采资源量为60×104m3/d。 How to evaluate the groundwater resources of the incomplete groundwater system on the west bank of the Yellow River in the Northern Shaanxi Energy and Chemical Industry Base is a difficult problem. In this study a regional model (1 km× 1 km) was constructed, which provided specified head boundaries for the imbedded model (100 m×100 m). By using the results of simulation of six different exploitation plans, the influence of water mining on the adjacent well fields and the regional groundwater system was ana- lyzed, and the interrelation between various sub-spring domains of the Tianqiao karst system and influence of the construction of the Wanjiazhai Reservoir on groundwater circulation was identified. At last the exploitable water resources in the water source area on the west bank of the Yellow River is estimated at 60×10^4m^3/d.
出处 《地质通报》 CAS CSCD 北大核心 2008年第8期1157-1164,共8页 Geological Bulletin of China
基金 中国地质调查局项目《陕北能源化工基地地下水勘查》(编号:1212010331302)资助。
关键词 数值模拟 嵌套模型 天桥岩溶系统 地下水资源评价 鄂尔多斯盆地 numerical modeling imbedded model Tianqiao karst system groundwater resource evaluation Ordos basin
  • 相关文献

参考文献6

二级参考文献36

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部