龙滩水电站大坝渗控系统的设计与实施 被引量:4

Design and Engineering of Dam's Seepage Control System for Longtan Hydropower Station
在线阅读 下载PDF
导出
摘要 龙滩水电站200 m级碾压混凝土重力坝渗控系统是大坝设计和施工的重点。针对工程实际情况,详细阐述了龙滩碾压混凝土重力坝采用全断面碾压混凝土,坝面采用变态混凝土与二级配碾压混凝土组合防渗形式方案的设计、施工、缺陷处理,结果表明,大坝渗流控制系统的实施效果较好,层面间扬压力较小。 The seepage control system plays a key role in design and construction of 200m RCC gravity dam at Longtan hydropower station. In light of the practical conditions of the project, the dam is built into a whole profile RCC gravity type. A seepage control proposal combining abnormal concrete and two-graded RCC is designed for dam profile, and is applied to engineering practice and defect treatment. Such seepage control system is proved to have good effect with relatively small uplift pressure between layers.
出处 《红水河》 2008年第4期15-19,共5页 Hongshui River
关键词 渗控系统 抽排水系统 设计 实施 龙滩水电站 seepage control system pumping-drainage system design implementation Longtan hydropower station
  • 相关文献

同被引文献28

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部