针对云驾岭矿岩巷大断面下山巷道施工特点,通过合理的施工机具及设备的配备、优化后路运输方式和支护工艺,减少各工序作业时间,实现多工序交叉平行作业,从而达到连续快速掘进的目的。
Based on the characters of large--sectional area dips in rock strata of Yunjialing coal mine, a fast and continuous heading technology is proposed for dips of the said type. The new-beading technique is based upon a rationalized use of appropriate equipment, optimized rock conveying and support techniques and alternating and/or overlapping operation of multiple processes.
出处
《中国煤炭》
北大核心
2008年第8期56-57,共2页
China Coal