介绍了双口垃圾填埋场围埝工程的施工方案,分析了地面以上的垃圾堆体稳定性、雨污分流、垃圾渗沥液侧渗及填埋气体迁移等问题及施工工艺。
Construction project of cofferdam engineering in Shuangkou Waste Landfill Site was introduced. The problems about stability of waste pile above ground level, rainwater and sewage shunting, side seepage of waste leachate, migration of landfill gas and construction technology were analyzed.