摘要
分析工程设计中一种常用的220kV变电站无功容量配置计算方法的不合理之处。按照我国目前供电规则和实际情况,重新计算变电站需要的无功补偿容量,并选择较优的分组容量,经济合理地配置无功补偿设备。
Analysis on project design, an usual calculating reactive power compensation capacity is irrationality in 220kV substation. By Chinese power supply regulation and actual situation, recalculate needed reactive power compensation capacity in 220kV substation and select the best subdivided capacity, it will distribute reactive power compensating device economically and reasonably.
出处
《广东输电与变电技术》
2008年第4期67-70,共4页
Guangdong Power Transmission Technology
关键词
220KV变电站
无功补偿
无功损耗
分组容量
220kV substation Reactive power compensation Reactive power loss Subdivided capacity