摘要
针对超临界机组的特点,提出了串联降压蒸汽吹管的吹管方法,介绍了这种方法的流程,并从给水量、储水箱水位和燃烧等方面进行控制,经分析可知,吹管的主要参数符合要求,证明该吹管方法的控制比较合理。
Aiming at characteristics of supercritical unit, parallel steam-blowing by step-down pressure method is advanced, including the process, and is controlled from aspects of feed water quantity, water level of water stored tank and burning, The main parameter of blowing according with need through analysis, and it is proved that the control of this method is appropriate.
出处
《河北电力技术》
2008年第1期31-33,共3页
Hebei Electric Power
关键词
超临界机组
降压吹管
流程
过程控制
supercritical pressure
process
process unit, steam-blowing by step-down control