摘要
1 000 MW超超临界锅炉尺寸大幅度加大后,对施工单位吊装机械提出了更高的要求。文章介绍了北仑电厂三期1000MW超超临界锅炉受热面安装过程中所采用的吊装、安装方法和施工过程。
The drastically increased size of 1 000 MW USC boiler places higher demand to contractor' s hoisting machinery. The process of hoisting, installation, and construction of Beilun Power Plant Phase Ⅲ 1 000 MW USC boiler heating surface are introduced.
出处
《电力建设》
2008年第7期82-86,共5页
Electric Power Construction
关键词
超超临界
锅炉
受热面
安装
ultra supercritical (USC)
boiler
heating surface
installation