期刊文献+

斜坡堆积体抗震加固措施离心模型试验 被引量:10

Centrifuge Model Test of Earthquake Countermeasures for Deposit-on-Slope
在线阅读 下载PDF
导出
摘要 为探讨地震作用下斜坡堆积体的加固破坏机理,基于拟静力法理论,采用土工离心模型试验技术和数值模拟方法,对采用抗滑桩、抗滑桩联合锚杆框架2种加固措施进行了对比分析.试验研究表明:坡脚只采用抗滑桩加固时,可能发生越顶坍塌的破坏模式;采用锚杆框架和抗滑桩联合加固,能够改善坡体内部的应力、应变分布规律,大大减小地震作用下坡面变形和抗滑桩受力.在此基础上提出:在高烈度地震区,对斜坡堆积体的工程设计应强调"固脚强腰"的防治原则. Based on the pseudo-static method, the reinforcement measures of anti-slide piles and their combination with anchor bolt frames were investigated with centrifuge model tests and numerical simulation in order to probe into the failure mechanism of deposit-on-slope reinforcement under an earthquake. The experimental results show that overtopping collapse possibly occurs when only antislide piles are used to reinforce the bottom of deposit-on-slope. Anti-slide piles combining with anchor bolt frames can improve the distributions of stresses and strains in deposit-on-slope, and decrease its deformation and force acting on anti-slide piles greatly. Based on the above results, it is suggested that the principle of "slope bottom reinforcement and mountainside strengthening" should be emphasized in the design of deposit-on-slope in high earthquake intensity regions.
出处 《西南交通大学学报》 EI CSCD 北大核心 2008年第3期335-340,共6页 Journal of Southwest Jiaotong University
基金 国家自然科学基金西部重大研究计划项目(90202007) 西部交通建设科技项目(200731800003) 西藏自治区交通厅资助项目(XZJK2006-1)
关键词 水平地震力 拟静力法 斜坡堆积体 离心模型试验 数值模拟 horizontal seismic force pseudo-static method deposit-on-slope centrifuge model test numerical simulation
  • 相关文献

参考文献5

二级参考文献31

共引文献149

同被引文献98

引证文献10

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部