摘要
以石太客运专线Z1标段南梁隧道为背景,介绍了双线Ⅳ级大跨段、双线Ⅱ级大跨段和单洞进双洞的施工方法,以完善隧道施工工艺,提高隧道工程的质量,可供同类工程参考借鉴。
Through taking the background of Nanliang tunnel for Z1 section in Shi-Tai main line of carrying-passengers,the paper introduces three kinds of construction methods,they respectively include the large-span section for double wire Ⅳ grade,Ⅱ grade large-span section and single holes entering into double holes,so as to perfect construction craft for tunnel and promote tunnel engineering's quality.This paper will provide a reference for other similar projects.
出处
《山西建筑》
2008年第16期330-331,共2页
Shanxi Architecture
关键词
客运专线
隧道
单洞
双洞
main line for carrying passengers,tunnel,single holes,double holes