摘要
介绍了南同蒲电气化扩能改造工程洪洞站既有概况,对洪洞站能力进行了分析,根据车站改造工程实施难易,分新建洪安涧河大桥和利用旧洪安涧河大桥两方案进行了研究,提出了洪洞站扩能改造的方案比选。
The general situation of Nantongpu electrification enlarging capacity transformation engineering Hongtong station was introduced,the energy of Hongtong station was analyzed.Based on the difficulty and easy of station transformation engineering implementation,the two schemes of new Honganjian river Bridge and using old Honganjian river Bridge were analyzed,provided the scheme selection and analysis of Hongtong station enlarging capacity transformation.
出处
《山西建筑》
2008年第16期321-322,共2页
Shanxi Architecture
关键词
电气化扩能
方案
改造工程