摘要
核岛主要设备安装是核电站建设工程的关键项目.本文概要介绍安装技术准备,描述环行吊车、反应堆压力壳、堆内构件、蒸汽发生器、反应堆冷却泵、稳压器、反应堆冷却管道的安装焊接程序。推荐安装质量要求及允许偏差,供参考.
Erection of main equipment in nuclear island is the important itemto construct PWR nuclear power plant engineering.This paper introducesthe technical preparation of installation,and describes the installation ofpolar crane,reactor vessel,in-pile component,steam generators,maincoolant pump,pressurizer and the pipes of main coolant system etc.Qua-oity requirement of installation and tolerence paratmeters are recommended.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1990年第2期19-26,48,共9页
Nuclear Power Engineering
关键词
核岛
设备
安装
核电站
Nuciear island
Erection procebures
Tolerenca