摘要 ARCNET网络的建模与仿真不仅能对ARCNET网络性能进行评估,而且能优化ARCNET网络设计。在深入理解ARCNET协议的基础上,利用OPNET网络仿真软件建立ARCNET列车通信网络的网络拓扑结构模型、节点的应用层进程模型和链路层进程模型。利用该模型,对ARCNET列车通信网络进行实时性和吞吐量的仿真。通过仿真得出要保证系统正常运行的最大误码率和影响端到端延时的主要因素。 Modeling and Simulation of ARCNET network was used to evaluate ARCNET network and optimize the ARCNET network design. On the basis of in-depth understanding of ARCNET protocol, it was utilized OPNET network simulation software to build the ARCNET train communication network, included the topology model, the node application layer model and the link layer model. The real-time performance and throughput capacity for the ARCNET train communication network were analyzed using the model. The simulation results showed that the main factors which influenced the end to end delay time, the BER(bit error rate) to guarantee the normal running of the System were given.
出处 《铁路计算机应用》 2008年第5期49-51,共3页 Railway Computer Application
关键词 列车通信网络 ARCNET 建模与仿真 OPNET train communication network ARCNET modeling and simulation OPNET
  • 相关文献

参考文献4

二级参考文献27

  • 1韩小涛,聂一雄,尹项根.基于OPNET的变电站二次回路通信系统仿真研究[J].电网技术,2005,29(6):67-71. 被引量:45
  • 2吴在军,胡敏强,杜炎森.变电站通信网络实时性能仿真分析[J].电力系统自动化,2005,29(8):45-49. 被引量:48
  • 3殷志良,刘万顺,杨奇逊,秦应力.基于IEC 61850标准的过程总线通信研究与实现[J].中国电机工程学报,2005,25(8):84-89. 被引量:133
  • 4吴在军,胡敏强,郑建勇,杜炎森.变电站过程CAN总线时延特性分析[J].电力系统自动化,2005,29(11):34-39. 被引量:8
  • 5Encksin D C. The use of fiber optics for communications,measurement, and control within high-voltage substation[J].IEEE Trans on Power Apparatus and Systems, 1980, 28(99): 1057-1062.
  • 6Luque J, Gonzalo F. Integrating power utility telecommunication networks[J], IEEE Computer Application in Power, 1996, 19(2): 27-30.
  • 7Skeie T, Johannessen S, Brunner C. Ethernet in substation automation[J]. IEEE Control System Magazine, 2002, 22(5): 43-51.
  • 8Electrical Power Research Institute (EPRI). UCA 2.0 Standard Document. Part I[Z]. USA.
  • 9Haude J. A pilot project for testing the standard drafts for open communication in substations-first experiences with the future standard IEC 61850[J]. IEEE Trans on Power Delivery, 1999, 5(2):79-90.
  • 10赵延华.LonWorks现场总线技术在列车监控系统中的应用[EB/OL].[2006-02-12].http://www.echelon.com.cn/solutions/transportation/appstories/trainmonitor.pdf.

共引文献75

同被引文献45

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部