钢管混凝土劲性骨架拱桥施工阶段稳定分析 被引量:9

Analysis on Stability of Concrete Filled Steel Tube Arch Bridge in Construction
在线阅读 下载PDF
导出
摘要 阐述了钢管混凝土拱桥的稳定分析理论,通过一个工程实例分析了其在施工过程中的线性和非线性稳定性,得到了两种情况下各个施工阶段的稳定安全系数。对钢管管内混凝土采用合理的灌注顺序,以及在施工中设置辅助设施均可以提高结构整体稳定性,保证施工安全。在施工稳定性分析中应考虑非线性的影响。 The linear and nonlinear buckling analysis on stability are introduced. Then according to an concrete filled steel tubular arch bridge ,some aspects in construction about stability were discussed. Rational filling method for concrete filled steel tube and some temporary safety facilities in construction can increase the coefficients of stability. The nonlinear influence must be considered in the analysis of stability of concrete filled steel tubular arch bridge in construction.
作者 邱麟 孙吉飚
出处 《重庆交通大学学报(自然科学版)》 CAS 2008年第3期366-369,共4页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 钢管混凝土拱桥 施工 稳定分析 非线性 concrete filled steel tubular arch bridge construction analysis of stability nonlinear
  • 相关文献

参考文献4

二级参考文献7

共引文献38

同被引文献58

引证文献9

二级引证文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部