摘要
详细介绍了宝钢5m宽厚板双边剪安装技术。此技术采用了先进的测量方法,保证了安装精度的要求。
The installation technology of double-side shear for 5 m wide plate was at Baosteel introduced in detail. This technology adopted the advanced measuring methods, guaranteed the installation accuracy.
出处
《山西冶金》
CAS
2008年第2期48-50,共3页
Shanxi Metallurgy
关键词
双边剪
静压导轨
宽厚板
安装技术
double-side shear, hydrostatic guide rail, wide plate, installation technology