水电工程投资风险分析及其应用研究 被引量:8

Investment Risk Analysis of Hydropower Project and Its Application
在线阅读 下载PDF
导出
摘要 水电工程一般具有规模大、投资大的特点,一旦发生风险,造成的经济损失往往很大,因此,对风险的前期评估就显得尤为重要。在分析水电工程投资(费用)和效益构成的基础上,研究了水电工程投资风险变量之间的影响关系。以我国西南地区某水电工程为背景,结合专家经验对该工程进行风险因素辨识,在综合考虑总成本费用及税收等因素的基础上,运用模拟技术,将水电工程投资风险与财务指标相结合,对工程投资风险及其指标进行分析评价,进而为项目的科学决策提供依据。 Preestimate of hydropower project investment risks is of much importance because of the huge economic loss caused by the negative effects of the risk factors.The structure of hydropower project investment and benefits is analyzed.Components of cash flow of hydropower project investment and finance evaluation are presented to study the effect of investment risk variables on hydropower project.Taking a hydropower station of the Southwest of China for example, we distinguish the risk factors of the station with expert experience.By considering the cost and tax of the project, by the simulation technique, which combines hydropower project investment risk and finance index, the project investment risk and indices are evaluated, which provides a basis for scientific decision-making of the project.
出处 《天津大学学报(社会科学版)》 CSSCI 2008年第3期228-233,共6页 Journal of Tianjin University:Social Sciences
关键词 水电工程 风险因素 投资风险分析 蒙特卡罗方法 模拟 hydropowerproject risk factor investment risk analysis Monte-Carlo method simulation
  • 相关文献

参考文献10

二级参考文献35

  • 1赵仪娜.经济评价中多因素敏感性分析的探讨[J].当代经济科学,1996,18(6):82-86. 被引量:3
  • 2曾立平.项目投资决策支持系统关键技术研究[D].重庆:重庆大学,2001.
  • 3.SL72—94.水利建设项目经济评价规范[S].,1994..
  • 4国家计委.建设项目经济评价参数与方法[M].北京:中国计划出版社,1994..
  • 5Al-Bahar J F, Crandall K C. Systematic Risk Management Approach for Construction Projects [J], Journal of Construction Engineering and Management, 1990, 116 (3): 533547.
  • 6Huseby A B, Skogen S. Dynamic risk analysis: the DynRisk concept [J]. International Journal of Project Management,1992, 10 (3): 160-164.
  • 7Ye S D, Robert Tiong L K. NPV-at-Risk Method in Infrastructure Project Investment Evaluation [J]. Journal of Construction Engineering and Management, 2000, 126 (3) :227-233.
  • 8Chapman C B, Cooper D. Risk Engineering Basic Controlled Interval and Memory Models [ J]. J. Opl. Res. Soc.,1983, 34 (1): 51-60.
  • 9Cooper D, Chapman C B. Control and management Risks-model, methods and cases [M]. John Wiley, UK, 1987.
  • 10Baker S, Ponniah D, ,Smith S. Techniques for the analysis of risks in major projects [ J]. Journal of the operational research society, 1998, 49:567-572.

共引文献133

同被引文献74

引证文献8

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部