摘要
提出武钢金属资源有限公司搬迁工程总图设计中遇到的问题及解决办法,理顺设计思路,探讨因地制宜进行总图布置的途经。
The present paper puts forward the problems encountered in designing the general plan of the relocation project of the Metal Resource Co., Ltd, WISCO and solutions to those problems and determines the proper way of thinking about the design and discusses the road to carry out the general plan disposition most suitable to the local conditions.
出处
《武钢技术》
CAS
2008年第2期26-29,共4页
Wisco Technology
关键词
金资公司
平面布局
竖向布置
管线综合
因地制宜
plan arrangement
integration of pipelines
to take measures suitable to the local conditions