摘要 考虑在制品库存费用、机床工时费、直接工人的工资费用、工件的提前和拖期完工造成的损失费用,提出了一种双资源柔性作业车间调度的生产费用计算方法.将模拟退火算法嵌入遗传算法中,设计了一种新的混合遗传算法.该算法首先利用遗传算法快速搜索一组较好的解,然后利用模拟退火算法进行群体寻优.采用基于工序的编码和一种新的解码方法,并运用多种交叉方法使得算法能够在解空间中尽可能地搜索最优解.为了避免最优解在进化过程中损失,采用择优操作将每代中的最优解保留下来,并不断更新.仿真结果表明:该方法是可行的,并具有一定的优越性. Considering the inventory cost of workpieces in process, machining time cost, direct labor cost, inventory cost of early finished products and cost increment due to late finished products, a method calculating production cost of dual-resource(machine tool plus labor) flexible job shop scheduling is proposed. A new hybrid genetic algorithm is designed by embedding simulated annealing algorithm (SA) into genetic algorithm (GA), where GA is used to search for a group of better solutions to the problem of minimizing production cost and then SA is applied to searching them for the best one. Introducing an operation-based encoding and a new decoding method, several kinds of crossover operations are used to enable the algorithm to search the optimal solution in solvable space as far as possible the course of evolution, the optimized solution uninterruptedly. An example is given to prove efficient. To avoid missing the optimal solution during in every generation is kept then updated that the scheduling method is feasible and
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2008年第4期561-564,共4页 Journal of Northeastern University(Natural Science)
基金 国家自然科学基金资助项目(50275025)
关键词 双资源 柔性作业车间调度 生产费用 混合遗传算法 dual-resource flexible job shop scheduling production cost hybrid genetic algorithm
  • 相关文献

参考文献9

  • 1王凌.车间调度及其遗传算法[M].北京:清华大学出版社,2002..
  • 2Lawrence S R. Scheduling a single machine to maximize net present values [ J ]. International Journal of Production Research, 1991,29(6) : 1141-1160.
  • 3Rohlder T R, Scudder G D. Comparing performance measures in dynamic job shops: economics vs. time [ J ]. International Journal of Production Economics, 1993,32 (2) : 169 - 183.
  • 4Nabil N, Elsayed E A. Job shop .scheduling with alternative machines[J]. International Journal of Production Research, 1990,28(9) : 1595-1609.
  • 5Shafaei R, Brunn P. Workshop scheduling using practical (inaccurate) data. Part 1: the performance of heuristic scheduling rules in a dynamic job shop envirolmlent using a rolling time horizon approach [J]. International Journal of Production Research, 1999,37(17) :3913 - 3925.
  • 6Shafaei R, Brunn P. Workshop ,scheduling using practical (inaccurate) data, Part 2: an investigation of the robustness of scheduling rules in dynamic and stochastic environment[J]. International Journal of Production Research, 1999, 37 (18):4105-4117.
  • 7潘全科,王化明,孙志峻,朱剑英.基于生产成本的作业调度[J].南京航空航天大学学报,2004,36(1):121-124. 被引量:8
  • 8宋锦河.基于模拟退火算法的生产调度问题[J].长春工程学院学报(自然科学版),2004,5(1):61-63. 被引量:10
  • 9Byung J P, Hyung R C, Hyun S K. A hybrid genetic algorithm for the job shop scheduling problems [ J ]. Computers & Industrial Engineering, 2003,45 (4) : 597-613.

二级参考文献9

  • 1Dessouky M I, Moray N, Kijowski B. Strategic behavior and scheduling theory[J]. Human Factors, 1995,37(3): 443~472.
  • 2Shafaei R, Brunn P. Workshop scheduling using practical (inaccurate) data part 1: The performance of heuristic scheduling rules in dynamic job shop environment using a rolling time horizon approach[J]. International Journal of Production Research, 1999,37(17): 3913~3925.
  • 3Rohlder T R, Sucdder G D. Comparing performance measures in dynamic job shops: economic vs. time[J]. International Journal of Production Economics, 1993,32:160~183.
  • 4.[M].,..
  • 5Shafaei R, Brunn P. Workshop scheduling using practical (inaccurate) data part 2: An investigation of the robustness of scheduling rules in dynamic and stochastic environment[J]. International Journal of Production Research, 1999,37(18): 4105~4117.
  • 6.
  • 7Shi Guoyong. A genetic algorithm to a classic jobshop scheduling problem[J]. International Journal of Systems Sciences,1997,28(1):25~32.
  • 8Nabil N, Elsayed E A. Job Shop scheduling with alternative machines[J]. Int J Prod Res,1990,28(9): 1595~1609.
  • 9袁富宇.用于多目标数据互联的模拟退火方法[J].系统工程理论与实践,1998,18(10):64-68. 被引量:9

共引文献36

同被引文献56

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部