摘要
介绍了运架梁一体机的结构,详细阐述了900 t运架梁一体机架设双线整孔预制箱梁的施工技术以及箱梁架设应采取的安全技术措施,以促进运架梁一体机架梁技术在工程中的应用。
The paper introduces the structure of carrying and proping beams integrated aircraft, and then elaborates its of 900 t construction technique for prefabricated box beams on installing double wire and full boles. Meanwhile, also elaborates safety technique measures to be adopted when boxs-beam are installed, hoping that this will promote the application of proping beams' technique for integrated aircraft in cartying and proping beams.
出处
《山西建筑》
2008年第12期301-302,共2页
Shanxi Architecture
关键词
运架梁一体机
架设
双线整孔预制箱梁
施工技术
integrated-aircraft in carrying and proping barns, installing, prefabricated box beams of clouble wire and full lades, corstruction techrique