摘要 某电厂旧输灰系统为上引式仓泵飞灰处理系统,运行后,发现系统存在诸多问题。采用双套管紊流密相输灰技术改造后,避免了输灰过程中输灰管的堵塞和磨损问题。运行结果证明,该系统经济性安全性均有明显提高。该文针对设计改造的设备选型、系统优化问题进行分析并提出了改进方法,根据双套管系统的特点对原理、操作参数调整进行了说明,对干除灰方面的工作有借鉴作用。 There are many problems found based on many years running of ascending-vessel ash handling system in a power plant. Adopting turbulent double-tube dense-phase handling technology, some problems llke tube blocking and abrasion have been solved. By practice proving that this system runs effectively and the economy dearly rises. Analysed design optimize questions and puts forward the improvement method in accordance with existing equipment and systems design, explanted its principle and operation parameter adjustment change according to double-tube system characteristics. The essay is to use for reference in pneumatic ash handling system.
作者 丁岩峰
出处 《电站辅机》 2008年第1期24-26,共3页 Power Station Auxiliary Equipment
关键词 飞灰 除灰 气力 输送 系统 紊流 套管 密相 fly ash pneumatic conveying system turbulence dual-tube dense phase
  • 相关文献

参考文献1

  • 1DL/T5142—2002,火力发电厂设计技术规程[S].中华人民共和国国家经济贸易委员会,2002.

共引文献1

同被引文献7

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部