期刊文献+

双环网络的[+h]边优先寻径策略 被引量:24

[+h]-Link Prior Routing Strategy for Double-Loop Network
在线阅读 下载PDF
导出
摘要 提出一种先走[+h]边、当走[+h]边不利时才走[+1]边的[+h]边优先寻径策略;得出[+h]边优先最短路径和双环网络的"竹筏"(一种新L形瓦)型空间解;"竹筏"中节点之间的[+h]边优先最短路径存在递推关系;由节点的[+h]边优先最短路径推出双环网络的直径公式;利用VB6.0和SQLServer2000仿真了[+h]边优先寻径策略;作者曾提出的[+1][+h]双边寻径策略是固定路径,寻找节点,而[+h]边优先寻径策略是固定节点,寻找路径;传统L形瓦难以构造但易求其等价双环网络的直径,而新L形瓦易构造但难以求其等价双环网络的直径;指出了陈忠学文中的几个错误. A [+h]-hi-link prior routing strategy, that [+h]-link is chosen prior until it is not favourable, then [+h]-link is chosen, is proposed, The shortest [+h]-link prior path and the bamboo raft (a new kind of L-shaped Tile) for a double-loop network are obtained. There is inferring relationships among nodes in the bamboo raft. The diameter of a double-loop network can be derived from the shortest [+h]-link prior path. VB6.0 and SQL Server2000 are selected to simulate the [+h]-link prior routing strategy. The [+1][+h] routing strategy proposed by the authors is fixing path then seeking nodes, while the [+h]-link prior routing strategy is fixing nodes then seeking path. The traditional L-shaped Tile is difficult to be constructed but is easy to calculate the diameter of its equivalent double-loop network, while the new L-shaped Tile is easy to be constructed but is difficult to calculate the diameter of its equivalent double-loop network. Some mistakes in the paper published by Chen in 2001 are pointed out.
出处 《计算机学报》 EI CSCD 北大核心 2008年第3期536-542,共7页 Chinese Journal of Computers
基金 国家自然科学基金项目“紧优双环网络及其无限族的研究”(60473142) 安徽省计算与通信软件重点实验室资助项目 安徽省教育厅重大项目(ZD2008005-1)资助
关键词 双环网络 [+h]边优先寻径 [+h]边优先最短路径 “竹筏” L形瓦 double-loop network [+h]-hi-link prior routing the shortest [+h]-link prior path bamboo raft L-shaped tile
  • 相关文献

参考文献5

二级参考文献14

共引文献40

同被引文献126

引证文献24

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部