摘要
通过对二滩水电站气温、库水温的实测资料、水库运行情况、库底淤积情况等分析,总结分析了影响高坝坝前水温的因素,认为在分析高坝水库水温时,除了要考虑水库的形状、水文气象条件外,还应充分考虑水库运行条件、水库初始蓄水条件对水库水温的影响。
In this paper, through analyses of Ertan Hydropower Station dam site ambient temperature and the reservoir water temperature measured data,reservoir operation conditions and sedimentation in the reservoir,the factors influencing the water temperature in front of the high arch dam are summarized and studied. It is deemed that during analysing water texture in a high dam reservoir, beside the reservoir configuration,hydrologic and meteorological conditions should be considered the reservior operation conditions and influence of the reservoir initial impoundment conditions on the reservoir water temperature should also be taken into full consideration.
出处
《水电站设计》
2008年第1期1-4,9,共5页
Design of Hydroelectric Power Station
关键词
高拱坝
水库
水温
温度
边界条件
影响因素
二滩水电站
high arch dam
reservoir
water temperature
temperature
boundary condition
influecing factor,Ertan Hydropower Station