期刊文献+

壳程较高压浮头盖的密封设计 被引量:1

Seal Design about the Floating Head Cover under Higher Pressure in Shell Side
在线阅读 下载PDF
导出
摘要 针对壳程较高压的浮头盖密封设计存在的管程二次试压易泄漏的问题,提出了以GB 150的法兰设计方法为基础的另外四种可行处理方法,包括垫片选优法、重紧浮头螺柱时的螺柱面积控制法、密封焊法和压差控制,对几种方法的优点和不足进行了比较。在垫片曾经分别满足内压和外压单独作用的前提下,一般当壳程与管程的设计压力比达1.2时,常用的垫片已难以满足一次拧紧即可内压或外压反复试压的要求。 Four kinds measures have provided to prevent the leak of floating head cove when second time making pressure test in tube side after it had under higher pressure in shell side, which base on the design theory about flange according to standard GB 150, include gasket optimizing, second time bolt tightening, seal up welding and pressure difference controlling. Both strongpoint and shortcoming of all measures have compared. Generally speaking, the gasket can not meet the seal need that just several pressure cycles which under tube side and shell side separately when the rat of pressure in shell side with pressure in tube side has high equal to 1.2, although it had even successful subject the pressure test in shell side and in tube side for ones time.
作者 陈孙艺
出处 《压力容器》 北大核心 2008年第2期18-22,共5页 Pressure Vessel Technology
关键词 泄漏 试压 垫片 浮头盖 换热器 leak pressure test gasket flouting head cover heat exchange
  • 相关文献

参考文献2

二级参考文献13

  • 1[1]ASME Boiler and Pressure Vessel Code[S], Section Ⅷ, Division 1, 1995.
  • 2[2]J. Payne. PVRC Flanged Joint User Experience Survey[R]. Welding Research Council Bulletin , No.306.
  • 3[3]ASME Boiler and Pressure Vessel Code[S], Section Ⅲ, Division 1, 1995.
  • 4[4]DIN2505: Stress Calculations of Bolted Flanged Connections[M], 1989 .
  • 5[5]ASME ANSI B31.1[S], Power Piping, 1989.
  • 6GB151-1999.管壳式换热器[S].[S].北京:国家质量技术监督局,1999..
  • 7[美]ASME Ⅷ -1[S].
  • 8M.H.Jawad & J.R.Farr. Structural Analysis and Design of Process Equipment[M],John Wiley & Sons lnc.,1989.
  • 9全国化工设备设计技术中心站.SW6-98压力容器设计软件包[P].
  • 10化工部化工设备设计技术中心站,SW6-1993压力容器设计软件包[P].

共引文献11

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部