摘要 根据二滩水电厂发电机低励限制曲线,计算出发电机通过主变吸收线路无功的最大值,并对计算结果与实际值的偏差进行了处理,得到了理想的效果,可以用于估算电厂的无功平衡。在水库枯水期,对优化机组运行方式、节能增发有一定的指导意义。 According to the minimum generator excitation limit curve of the Ertan Hydropower Plant, the maximum reactive power absorbed by the generator-transformer units is calculated. A satisfactory result is obtained by processing the deviation between the calculated result and actual values, and it can be used for the estimation of the reactive power balance of the hydropower plant. The calculated result can be used as guidance for optimizing the operation mode of the generators, saving energy and increasing power in dry period.
作者 王世界
机构地区 二滩水力发电厂
出处 《水电自动化与大坝监测》 2008年第1期43-46,共4页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 水电厂 发电机变压器组 无功 自动发电控制 hydropower plant generator-transformer unit reactive power AGC
  • 相关文献

参考文献6

二级参考文献21

  • 1朱敏,王定一.电力系统中梯级水电站的日优化运行研究[J].华中理工大学学报,1997,25(1):47-50. 被引量:8
  • 2朱敏,王定一.电力系统中梯级水电站实时优化运行控制新算法[J].电力系统自动化,1997,21(4):30-33. 被引量:21
  • 3Arce A, Ohishi T. Optimal Dispatch of Generating Units of the Itaipu Hydroelectric Plant. IEEE Trans on Power Systems, 2002, 17(1).
  • 4Hobbs W J. An Enhanced Dynamic Programming Approach for Unit Commitment. IEEE Trans on Power Systems, 1988, 13(3).
  • 5Liang R H,IEE Proc Gener Trans Distrib,1994年,141卷,5期,452页
  • 6张立明,人工神经网络的模型及其应用,1993年
  • 7杨纶标.模糊数学原理及应用.广州:华南理工大学出版社,2001.139-147
  • 8于兰阶.水轮发电机组的安装与检修.北京:中国水利水电出版社,1995.133-135
  • 9华中工学院.水电站经济运行.北京:水利水电出版社,1980.124,125
  • 10董子敖.水库群调度与规划的优化理论和应用.济南:山东科学技术出版社,1989.319-327

共引文献48

同被引文献1

  • 1张健,孙华东.二滩电站枯水期调压策略研究[D].中国电力科学研究院,2009.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部