摘要
应用仿真技术对南水北调东线工程水量调度进行了模拟,建立了南水北调东线调水仿真模型。南水北调东线工程调水仿真模型对东线工程所经过的黄河以南5个湖泊、13级提水泵站,黄河以北的4个水库的水量调度联合运行进行了模拟计算,模型既模拟了东线工程范围内各湖泊、洼淀间的水力关系,也模拟了供水区的水资源供需关系,取得了较好的成果,可以为有关部门的决策提供背景材料和决策依据。
The simulation technology is applied to simulate the process of water quantity optimization in the East Route of the South-to-North Water Transfer Project and a simulation model is setup. The joint simulation by this model to 5 lakes, 13 pumping stations, and 4 reservoirs in the south of Yellow River shows both the hydraulic relationship between lakes and reservoirs, and the water supply & water demand relationship in the water supply areas, This simulation model calculations obtained good results and it can provide support the background data and decision-making assistant to the department concerned.
出处
《南水北调与水利科技》
CAS
CSCD
2008年第1期73-76,共4页
South-to-North Water Transfers and Water Science & Technology
基金
水利部南水北调规划设计管理局"北方地区水资源总体规划"项目(Q50102)
关键词
南水北调东线工程
仿真技术
水量调度
the East Route of South-to-North Water Transfer Project
Simulation Technology
Water Quantity Optimization