摘要
针对顶管施工中经常出现的一些障碍,总结了顶管工作者的实践经验,提出了一些新的解决方法,并阐述了障碍的许多预防措施,希望对以后的顶管施工实践有所帮助。
In allusion to the holdbacks which often come forth in pipe-jacking construction, the practicing experience of many pipe-jacking operators is summed up and some new settling methods are put forward in the text. Many preventing measures are also narrated in the text. These are wished to can hdp future pipe-jacking construction.
出处
《山西建筑》
2008年第7期171-172,共2页
Shanxi Architecture
关键词
顶管
障碍
预防
解决办法
pipe-jacking, holdback, preventing, settling methods