客运专线32m后张法双线整孔箱梁预制施工 被引量:3

Prefabricated construction of 32m double-track whole span box girder by post-tensioning method in passenger dedicated line
在线阅读 下载PDF
导出
摘要 针对32 m整孔箱梁预制施工工艺复杂、施工精度要求高、施工组织管理难度大等难点,在学习借鉴国内外箱梁施工先进技术的基础上,总结了一套较完善的箱梁预制施工技术,并详细介绍了该技术的关键工序,以供参考借鉴。 In light of the difficulties of the prefabricated construction of 32 m whole span box girder as complicated construction technologies, high requirements on constriction precision, and difficult construction organization and management, the author summarizes a set of rather perfect prefabricated construction technologies of box girder on the basis of learning advanced construction technologies of box girder at home and abroad, and introduces the key procedures of the technology, in order to offer a reference.
作者 姚锁平
出处 《山西建筑》 2008年第7期159-160,共2页 Shanxi Architecture
关键词 模板 钢筋 箱梁 预应力结构 施工精度 formwork, rebar, box girder, pre-stressed structure, construction precision
  • 相关文献

参考文献2

二级参考文献2

共引文献15

同被引文献8

  • 1铁路客运专线预应力混凝土预制梁施工技术标准[S].
  • 2铁路客运专线预应力混凝土预制梁暂行技术条件[S].
  • 3TLEJGF-91-03,现场预制32m后张法预应力混凝土铁路桥简支梁工法[S].
  • 4TLEJGF-01·02-10,铁路客运专线24m后张法单线箱粱现场预制工法[S].
  • 5JTJ041-2000.公路桥涵施工技术规范[S].[S].,..
  • 6TZ210-2005.路桥工程施工技术指南[S].中国铁道出版社,2005.
  • 7JGJ85-2002.预应力筋用锚具、夹具和连接器应用技术规程[S].中国建筑工业出版社,2002.
  • 8李华冰.秦沈客运专线24m后张法单线箱梁预制施工技术[J].上海铁道科技,2004(2):27-28. 被引量:2

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部