基础设施BOT项目中的可控制风险管理研究 被引量:8

Research on Controllable Risk Management in Infrastructure BOT Projects
在线阅读 下载PDF
导出
摘要 在无法把握BOT项目的不可控制风险的情况下,如何减小或避免可控制风险就显得犹为重要。为增强对可控制风险管理的有效性,在对可控制风险进行界定的基础上提出了按风险发生的时间阶段进行重点管理的方法和风险分解的管理方法,并对这两种方法进行了论述。 How to avoid or reduce the controllable risk is the most important thing in the BOT project, under the condition that it is hard to grasp those uncontrollable risks. In order to strengthen the management efficiency on controllable risk, two methods including managing according to the time stage and managing based on decomposing the risk are purposed, based on the definition of controllable risk. At last, these two methods are also discussed.
出处 《软科学》 CSSCI 2008年第2期79-82,共4页 Soft Science
基金 国家自然科学基金资助项目(70371045)
关键词 BOT 可控制风险 项目公司 BOT controllable risk project company
  • 相关文献

参考文献13

  • 1Loh Ngee, Tiong R L K, Jahidul Alum. Automated Approach to Negotiation of BOT Contracts[ J]. Journal of Computing in Civil Engineering, 1997, 11 (2) : 121 - 128.
  • 2Ashley D, Bauman R, Carroll J, Diekmann J, Finlayson F. Evaluating Viability of Privatized Transportation Projects [ J ]. Journal of Infrastructure System, 1998, 4(3) : 102 - 110.
  • 3Peter K Nevitt, Frank Fabozzi. Project Financing[ M]. Euromoney Publications, 1995.
  • 4Yeo K T, Tiong R L K. Positive Management of Differences for Risk Reduction in BOT Projects [ J ]. International Journal of Project Management, 2000,18(4) :257 - 265.
  • 5Mohamed M Askar, Ahmed A Gab - Allah. Problems Facing Parties Involved in Build Operate and Transport Projects in Egypt[ J]. Journal of Management in Engineering,2002,18(4) : 173 - 178.
  • 6Tiong R L K. Risks and Guarantees in BOT Tender[J]. Journal of Construction Engineering and Management, 1995,121 (2) : 183 - 188.
  • 7Tiong R L K. Impact of Financial Package Versus Technical Solution in a BOT Tender [J]. Journal of Construction Engineering and Management, 1995,121 (4) :304 - 311.
  • 8David A K, Fernando P N. The BOT Option. Conflicts and Compromises[J]. Energy Policy, 1995,23(8) :669 -675.
  • 9Nisangul Ceran. Private Participation in Infrastructure: A Risk Analysis of Long- term Contracts in Power Sector[ D]. Ph. D. Thesis, George Mason University, 2002.
  • 10Zhang W R. ,Wang S Q, Tiong R L K, Tiong S K, Ashley D. Risk Management of Shanghai' s Private - financed Yan' an Donglu Tunnels [ J ]. Journal of Engineering Construction and Architecture Management, 1998, 5(4) : 399 -409.

二级参考文献24

  • 1金永祥,童玫.BOT项目讲座(十) 价格项目重要的商务条件[J].中国投资(中英文),2002(11):90-91. 被引量:6
  • 2陈煌铭,陈炳富.论民营化基础建设BOT项目风险之管理战略[J].南开管理评论,1999,2(2):47-51. 被引量:7
  • 3Min- cheng Lin. Contract design of private infrastructure concessions[ D]. University of California, Berkeley, 2000.
  • 4Yeo, K. T., Tiong, R. L. K. Positive management of differences for risk reduction in BOT projects[J]. International Journal of Project Management, 2000,18 (4): 357 - 265.
  • 5Mohamed, M. Askar, Ahmed, A. Gab - Allah. Problems Facing Parties Involved in Buid Operate and Transport Projects in Egypt[J]. Journal of Management in Engineering,2002,18(4) :173 - 178.
  • 6Tiong, R. L. K. Risks and guarantees in BOT tender [ J ].Journal of Construction Engineering and Management,1995,121(2) :183 - 188.
  • 7Tiong, R. L. K. Impact of financial package versus technical solution in a BOT tender[J]. Journal of Construction Engineering and Management, 1995,121 (4): 304 - 311.
  • 8David, AK, Fernando, P. N. The BOT option. Conflicts and compromises[ J ]. Energy policy, 1995,23 (8): 669 - 675.
  • 9Shen, L. Y., Lee, K. H., and Zhang, Z. Application of BOT system for infrastructure projects in China [ J ]. Journal of Construction Engineering and Management, 1996,122 (4):319 - 323.
  • 10Shen,L,Y. ,Wu,Y.Z.Risk concession model for build operate transfer contract projects[J]. Journal of Construction Engineering and Management, 2005,131 (2): 211 - 220.

共引文献39

同被引文献68

引证文献8

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部