1~#750m^3高炉停炉实践

Blowing out Practice of Laigang 750-m^3 BF #1
在线阅读 下载PDF
导出
摘要 莱钢1^#750m^3高炉安全服役12年,采用空料线打水回收煤气停炉,整个过程安全、顺利、快速停炉。残铁口位置选定准确,残铁基本放净,为高炉大修创造了良好条件。 750 - m^3 blast furnace #1 in Laigang was in service safely for twelve years. It was blown out by adopting stock-line vacancy-and-water-drilling and coal gas reclaiming, the whole blowing out course being safe,smooth and high-speed. The position for crude pig iron was selected accurately, with crude pig iron being released on the whole, creating a fine condition for its overhaul.
机构地区 炼铁厂
出处 《莱钢科技》 2007年第6期19-20,共2页 Laigang Science & Technology
关键词 高炉 停炉 降料线 放残铁 blast furnace blow out lowering stock-line crude pig iron release