摘要
从交通部自然生态保护理念、施工方便、安全以及运营过程中的安全、养护、维修等各方面论证了施工图设计阶段较初步设计阶段方案进行了调整是合理的,可供桥梁设计工程参考借鉴。
The article proves the rationality of the adjustment of scheme at the stage detail design compared with the .scheme at the primary design stage from the concept of natural ecological protection, construction convenience and safety, and security, maintenance and reparation in operation process, in order to offer a reference for bridge design engineering.
出处
《山西建筑》
2008年第4期330-331,共2页
Shanxi Architecture
关键词
施工图设计
初步设计
设计理念
detail design, primary design, design concept