摘要
对现场施工时检测时间不同引起的灰剂量检测结果不同进行了分析,从理论和实践两方面对灰剂量衰减进行了分析,提出了由于时间的推移会引起灰剂量检测值的衰减,解决了现场施工时灰剂量检测值与掺入量不一致的问题。
It analyzes the difference of ash content checking result caused by different checking time during on-spot construction. From theoretical and practical aspects, it discusses and analyzes the descending of ash content, and put emphasis on bringing, forward time' s impact on descending of ash content checking value, solves the problems that the difference between ash checking value and adding amount during on-spot construction.
出处
《山西建筑》
2008年第2期182-183,共2页
Shanxi Architecture
关键词
道路
现场施工
灰剂量
衰减
road, on-spot construction, water content, descending