期刊文献+

三峡工程船闸闸室直立坡锚固监测成果分析 被引量:1

Analysis of Monitoring Results of Anchorages at Vertical Slope of Shiplocks of the Three Gorges Hydroelectric Project
在线阅读 下载PDF
导出
摘要 为了保证三峡双线五级船闸闸室直立坡施工期安全,了解岩体变形情况,对其锚索、锚杆锚固状态进行了安全监测分析。分析认为,其锚索锚固力变化总体上分为速损期、波动期和平稳期三个阶段,锚索锚固力和锚杆应力主要受闸室开挖后岩体变形影响。目前直立坡北坡锚索测力计平均损失率13.2%,中隔墩锚索测力计平均损失率9.3%,南坡锚索测力计平均损失率11.9%,直立坡锚杆应力一般在50 MPa以下。分析结果表明,锚索、锚杆在加固直立坡稳定方面作用显著,闸室直立坡处于稳定状态。 In order to insure safety of construction of the vertical slope of double-line, five- flight shiplock, and have a good command of deformation of rock mass, an analysis of monitoring results of the conditions of their anchorage cables and anchor rods have been performed. The analysis shows the change of anchorage strength of anchorage cables fall into the following three stages: rapid damage stage, fluctuating stage and steady stage. The anchorage strength of anchorage cables and the stress of anchor rods are normally influenced by the rock deformation caused by excavation of shiplocks. Presently the loss rate of strength meter for anchorage cables on the north vertical slope is 13.2%, while that on the middle dividing piers 9.3%, and 11.9% on the south vertical slope on average respectively, and the stress of the anchor rods on vertical slope is generally less than 50 MPa. The study results indicate the function of anchorage cables and anchor rods in stabilizing the vertical slope is obvious and the shiplock vertical slope is in stable condition.
作者 周严伟 徐波
出处 《水力发电》 北大核心 2007年第12期73-75,共3页 Water Power
关键词 锚索 锚杆 安全监测 双线五级船闸 闸室直立坡 三峡工程 anchorage cable anchor rod safety monitoring double-line and five-flight shiplock vertical slope of shiplock Three Gorges Hydroelectric Project
  • 相关文献

同被引文献5

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部