期刊文献+

某尾矿坝体浸润线有限元模拟分析 被引量:1

Analysis of Finite Element Method by Simulation on One Tailing Dam Saturation Line
原文传递
导出
摘要 浸润线是尾矿坝的生命线.论文应用有限元分析某尾矿坝的浸润线,认为(1)尾矿坝浸润线与放矿滩长有关系,随着放矿滩长加大,浸润线远离砂砾石坝体,从有限元模拟情况可知放矿滩长大于70m时各工况下浸润线不在坝趾出露,这时坝体是稳定的.(2)对于建在透水性强的坝址上的尾矿坝,坝体的填筑高度对浸润线在坝趾出露影响不明显.图9,表1,参10. Saturation line is the lifeline of tailing dam. One tailing dam saturation line was analyzed by finite element method, the conclusions are gotten that ( 1 ) The tailing dam saturation line is related with the drawing beach length, with the beach length increasing, the saturation line become far from the grit dam body. When beach-length is more than 70 meters the saturation line away from the dam's foot according to the conclusion of finite element simulation, the dam is stable. (2) The tailing dam is built on the strong water penetration site,the dam's height influences saturation line isn't distinct in the dam's foot. 9figs., ltab., 10refs.
出处 《湖南科技大学学报(自然科学版)》 CAS 北大核心 2007年第4期23-25,共3页 Journal of Hunan University of Science And Technology:Natural Science Edition
基金 国家自然科学基金资助项目(40272112)
关键词 浸润线 有限元 稳定性 saturation line finite element stability
  • 相关文献

参考文献5

二级参考文献20

共引文献106

同被引文献12

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部