摘要
结合施工实际情况,根据煤层采空区的特点,介绍了采用全充填注浆法施工工艺对其地基进行地质灾害治理的情况。
Connecting with the actual situation of the construction, and according to the features of the coal gob area, this paper introduces the treatment of the geological hazards for the foundation by using completely filled grouting.
出处
《科技情报开发与经济》
2007年第34期264-266,共3页
Sci-Tech Information Development & Economy
关键词
全充填注浆法
煤层采空区
施工工艺
completely filled grouting
coal gob area
construction technology